Operation CHARM: Car repair manuals for everyone.

Charging the System


1. Remove high and low service valve protective caps.
2. Connect manifold set, then open filling cylinder valve. Refer to Specifications.
3. When specified refrigerant level has been reached, close gauge set low pressure valve and refrigerant supply valve.
4. Operate system until pressures stabilize, then ensure proper operation and pressures.
5. When charging is complete and system operating pressures are normal, disconnect manifold gauge set and install protective caps on service port valves.