Pressurizing Suspension System
Pressurizing Suspension SystemFig. 3 Automatic Level Control System. 190D & E, 260E, 300CE, D & E:
Fig. 4 Automatic Level Control System. 300TE:
Fig. 5 Automatic Level Control System. 300SE & SEL, 420SEL, 560SEC & SEL:
Fig. 6 Automatic Level Control System. 560SL:
Ensure hydraulic fluid is at proper level prior to pressurizing (filling) the suspension system.
1. The suspension system, Figs. 3 through 6, may be pressurized using either one of the following methods (a or b):
a. Place a load of approximately 330 lbs. in vehicle's luggage compartment, then start and operate engine at high idle for approximately 1 minute.
b. Disconnect leveling valve connecting rod with lever in ``F'' (filling) position. Operate engine at high idle for approximately 30 seconds, then attach connecting rod to lever.