Model 210
Group: 82Number: 344
Date: October 1995
SUBJECT:
MODEL 210 M.Y. 1996
INSTALLATION OF CD CHANGER
1. Remove hardware from shipping box and verify contents.
2. Remove shipping screws (2, Figure 1) from CD changer. Place shipping screws in ID card bag. Cover screws holes with dust covers.
2a. Set orientation adjustment on sides of CD changes to vertical (V). Secure with adhesive covers.
3. Remove trunk floor mat.
4. Locate factory bus cable in left wheel well.
5. Attach CD changer to CD mounting bracket using four screws.
6. Connect bus cable to CD changer.
7. Position the CD changer unit so that the tabs on mounting bracket align over pre-drilled factory mounting locations.
8. Secure top mounts with screws.
9. Install CD changer cover.
10. Install CD magazine in to CD changer unit.
11. Reinstall trunk floor mat.
12. Test function.
Parts Information
Recommended Labor Time