Operation CHARM: Car repair manuals for everyone.

Preparation For Test




Preparation for Test:
1. Review Technical Changes, Component Locations, Preparation for Test and Code Programming,
2. Fuses ok,
3. Battery voltage 11 - 14 V,
4. CL systems ok,
5. RCL, RFL ok,
6. Provide access to PSE control module (A37)
7. Voltage supply to Control module and CAN wiring ok.
8. Connect socket box with test cable according to connection diagram. Connecting Tester Or Scanner, Reading and Erasing DTC Memory

Refer to Electrical Wiring Diagrams







Special Tools


Conventional tools, test equipment
Description Brand, model, etc.
:
Multimeter 1) Fluke models 23, 83, 85, 87

1) Available through the MBNA Standard Equipment Program.


Connection Diagram - Socket Box






A37 PSE control module
001 PSE control module connector
002 Test cable
003 Multimeter
004/050 Socket box (35-pole)
A ATA test cable
C Central locking test cable