Preparation For Test - Section 22
1. Voltage supply to all control modules and CAN data lines Ok,
2. Battery voltage 11 - 14V,
3. Review Connection and Use of Test Equipment,
4. Review General Information, Version Coding, Diagnosis, DTC Memory, Recalling Actual Values, Component Locations, Connection of Components and Preparation for Test,
5. Connect HHT,
6. Review Electrical Wiring Diagrams.
Special Tools:
Test equipment:
Description Brand, model, etc.
Digital multimeter Fluke models 23, 77 III, 83, 85, 87
Connection Diagram - Socket Box
Model 210 (sedan shown):
Connection Diagram - Socket Box
A37 PSE control module, combined functions
N10-1 Combination control module (model 210)
001 PSE control module connector
002 Test cable
003 Multimeter
004/050 Socket box (35-pole)
Connections - PSE control module (A37)
1 Connector 1 (control line PSE)
2 Connector 2 (voltage supply PSE)
3 Connector 3 (control line ATA)
4 Connector 4 (load connections ATA)