Preparation For Test - Section 22
Preparation for Test:
1. Voltage supply to all control modules and CAN data lines Ok,
2. Battery voltage 11 - 14V,
3. Review Connection and Use of Test Equipment. Scan Tool Testing and Procedures
4. Review General Information, Version Coding General Information, Version Coding
DTC Memory Diagnostic Trouble Code (DTC) Memory - Section 12
Component Locations Component Locations - Section 20
Connection of Components Component Locations - Section 21
5. Connect HHT,
6. Review Electrical wiring Diagrams.
Special Tools:
Test equipment;
Description Brand, model, etc
Digital multimeter Fluke models 23, 77 III, 83, 85, 87
Connection Diagram - Socket Box
Model 210 (sedan shown)
A37 PSE control module, combined functions
001 PSE control module connector
002 Test cable
003 Multimeter
004/050 Socket box (35-pole)
Connection Diagram - Socket Box
N10-1 Combination control module (model 210)
001 PSE control module connector
002 Test cable
003 Multimeter
050 Socket box (35-pole)
Connections - PSE control module (A37)
1 Connector 1 (control line PSE)
2 Connector 2 (voltage supply PSE)
3 Connector 3 (control line ATA)
4 Connector 4 (load connections ATA)