General
Activation of the Pneumatic System Equipment (PSE):
The control wire from the RHR unlocking switch (S6/1s3) is connected to the signal pick-up and activation module (SAM) (N10/1). From the signal pick-up and activation module (SAM) (N10/1), the activation signal is sent via two CAN data lines to the PSE control module (A37).