PTP - Pneumatic Test Program
Preliminary work:
PSE control module voltage supply 1.0 - 4.0
PSE Control Module Test PTP - Pneumatic Test Program
Preparation for test:
1. Review Connection and Use of Test Equipment,
2. Review Component Locations, Connection of Components and Pneumatic Test Program.
DATA (mbar)
Test procedure
Allowable system leakage of 300 mbar vacuum in 1 minute,
Permissible deviation: <= 30 mbar
Allowable leakage of actuators with line at 300 mbar vacuum in 1 minute,
Permissible deviation: <= 25 mbar
Special Tools:
A. Entire System
Preparation for Test:
1. Disconnect yellow central locking (CL) pneumatic line from PSE control module.
2. Connect tester to disconnected pneumatic line using connector 202 805 03 44.
NOTE: If an actuator does not operate correctly and no leakage is found, check the respective lines for kinks or blockages.
Parts required for test:
1 Connector 202 805 05 44
2 Rubber hose, 50 mm long 007 997 61 82
1 Pneumatic line, 1 m long 000 158 14 55
NOTE: The connections on the PSE control module and pneumatic multiple connector are marked with their German acronyms. In other words:
ZV (German) = CL (English),
SRU (German) = MVA (English),
OSL (German) = OSB (English).
Test Steps 1.0:
B. Pneumatic Line With RTR Actuator
Preparation for test:
1. Disconnect pneumatic line connected to connector F of pneumatic distributor.
2. Connect tester to disconnected pneumatic line using rubber hose, part no. 007 997 61 82.
NOTE: After testing, reconnect prior disconnected pneumatic line using rubber hose part no. 007 997 61 82 to pneumatic distributor.
Parts required for test:
1 Rubber hose, 50 mm long 007 997 61 82
Parts Required for Repair
Rubber hose (as necessary) 007 997 61 82
Test Steps 2.0:
C. Pneumatic Line
Preparation for test:
1. Remove trunk lid lock.
2. Connect tester to pneumatic connector.
Parts required for test:
1 Pneumatic line, 1 m long 000 158 14 35
2 Connector, 50 mm long 007 997 61 82