ETP - Preparation For Test [22]
Electrical Test Program - Preparations for Test [22]
1. Review Section: 11 entirely. Initial Inspection and Diagnostic Overview
1. Ignition: OFF,
2. Remove ETC control module (N15/3),
3. Connect socket box and test cable according to connection diagram below.
4. Review Section: 21 entirely. ETP - Component Locations [21]
Special Tools:
Test equipment:.
Description Brand, model, etc.
Digital multimeter Fluke models 23, 77 III, 83, 85, 87