Operation CHARM: Car repair manuals for everyone.

ETP - Preparation For Test [22]




Electrical Test Program - Preparations for Test [22]

1. Review Section: 11 entirely. Initial Inspection and Diagnostic Overview
1. Ignition: OFF,
2. Remove ETC control module (N15/3),
3. Connect socket box and test cable according to connection diagram below.
4. Review Section: 21 entirely. ETP - Component Locations [21]

Special Tools:






Test equipment:.
Description Brand, model, etc.
Digital multimeter Fluke models 23, 77 III, 83, 85, 87


Model 129:




Model 140:




Model 163:




Model 170:




Models 202, 208:




Model 210: