Heated Glass Element: Testing and Inspection
1. Reconnect any components that were disconnected in the Pinpoint Tests.2. Key ON.
3. Turn on the heated back window switch.
4. Measure the voltage at the center of each heated back window grid filament.
5. The voltages should be 5 volts (± 1 volt) at the center of each filament.
6. If the heated back window grid does not operate as specified, repair the filament(s) in question by referring to the grid wire repair procedure.