Test Y
PINPOINT TEST Y: THE PANEL/FLOOR AND COOL/WARM CONTROLS ARE INOPERATIVE USING THE FRONT AUXILIARY CLIMATE CONTROLSTest Y1-Y2:
Normal Operation
Under normal operation, the front auxiliary climate control assembly receives voltage from circuit 1003 (GY/YE) and ground from 1205 (BK).
Possible Causes
- An open in circuit 1003 (GY/YE) or 1205 (BK).
- Front auxiliary climate control assembly.