Operation CHARM: Car repair manuals for everyone.

Tests AG

PINPOINT TEST AG: THE INSTRUMENT CLUSTER IS INOPERATIVE


Test AG1:






Test AG2-AG4:






Normal Operation
The instrument cluster receives the START/RUN power from central junction box (CJB) fuse 21 (5A), circuit 489 (PK/BK). The RUN/ACC power is from CJB fuse 15 (5A), circuit 295 (LB/PK) and the keep-alive power from the battery junction box (BJB) fuse 49 (15A), circuit 3049 (BK/LG). The instrument cluster grounding is accomplished through circuit 1203 (BK/LB) and the bulb grounding is accomplished through circuit 1205 (BK).

Possible Causes
- CJB fuse(s): 15 (5A) and 15 (5A)
- BJB fuse 15 (10A)
- circuit 295 (LB/PK) open or shorted to ground
- circuit 489 (PK/BK) open or shorted to ground
- circuit 1203 (BK/LB) open or shorted to power
- circuit 1205 (BK) open or shorted to power
- circuit 3049 (BK/LG) open or shorted to ground
- instrument cluster