Test B: The Horn Is Always On
PINPOINT TEST B: THE HORN IS ALWAYS ONB1-B2:
B2-B4:
B4-B7:
B8:
Normal Operation
The SJB receives the horn signal through circuit 1 (DB) when the horn switch is pressed, which grounds through the speed control actuator via circuit 848 (DG/OG). The SJB then activates the horn relay through circuit 1323 (OG/RD). Power is sent to the horn through circuit 6 (YE/LG), and the ground is provided through circuit 1205 (BK).
Possible Causes
- circuit 1 (DB) short to ground
- circuit 6 (YE/LG) short to voltage
- circuit 1323 (OG/RD) short to ground
- horn switch
- clockspring
- horn relay
- SJB