Test B: DTC B1360 - Ignition ACC/Run Circuit Open
Pinpoint Test B: DTC B1360-Ignition ACC/RUN Circuit OpenTest B1:
Test B2-B3:
Test B3-B5:
Test B5-B7:
Normal Operation
The ignition switch ACC/RUN circuit sends 12 volts through circuit 75 (DG/LG) on the central junction box (CJB) input side fuse 15 (5A), and circuit 295 (LB/PK) on the CJB output side fuse 15 (5A) to the instrument cluster. The ignition switch RUN/START circuit sends 12 volts through circuit 16 (RD/LG) on the CJB input side fuse 21 (5A), and circuit 489 (PK BK) on the CJB output side fuse 21 (5A) to the instrument cluster. The instrument cluster monitors the output voltage from the ignition circuit and if an open circuit is detected DTC B1360 is set.
Possible Causes
^ circuit 16 (RD/LG) open
^ circuit 75 (DG/LG) open
^ circuit 295 (LB/PK) open
^ circuit 489 (PK BK) open
^ ignition switch
^ CJB
^ instrument cluster