Principles of Operation
PRINCIPLES OF OPERATIONAfter the engine is started, voltage is applied through the I (ignition) circuit CDC09 (YE) from the PCM to the voltage regulator. This turns the regulator on, allowing current to flow from the A (battery sense) circuit SDC02 (RD) to the generator field coil. At this time, the generator begins to generate current, which is then supplied to the vehicle electrical system through the output (B+) terminal of the generator.
Once the generator begins generating current, a voltage signal is taken from the generator stator and fed back to the regulator. This voltage feedback signal (typically half the battery voltage) is used by the regulator to provide a signal to the PCM. This, in turn, provides a signal over the controller area network (CAN) communication link to the instrument cluster (IC) to turn off the charging system warning lamp. This indicates the charging system is operating properly. The S (stator) circuit is internal to the generator on 4.6L applications, but is an external circuit VDC42 (GN) on 4.0L applications.
With the system functioning normally, the generator output current is determined by the voltage of the A circuit SDC02 (RD). The A circuit SDC02 (RD) voltage is compared to a set voltage internal to the regulator. The regulator controls the generator field current to maintain the correct generator output.
The set voltage varies with temperature and is typically higher in cold temperatures and lower in warm temperatures. This allows for better battery recharge in the winter and reduces the possibility of overcharging in the summer.
This is a System 2 charging system, which uses a PCM-controlled I (ignition) circuit to the generator regulator, circuit CDC09 (YE). System 2 charging systems are virtually identical in design and therefore, share the same diagnostics. The circuit numbers and colors may be different, but the functions are the same. System 2 charging systems may use any type of generator, as the generator type usually depends on the engine packaging and/or output requirements versus cost.