Operation CHARM: Car repair manuals for everyone.

Road Testing Vehicle




Road Testing Vehicle

NOTE: Always drive the vehicle in a safe manner according to driving conditions and obey all traffic laws.

NOTE: If a new or remanufactured transaxle assembly is being installed or a new solenoid body is installed, the PCM will have to be re-programed with a new solenoid body strategy and identification data file. The solenoid body strategy drive cycle should also be carried out. Refer to Solenoid Body Strategy Solenoid Body Strategy.

The Shift Point Road Test and Torque Converter Operation Test provide diagnostic information on shift controls and torque converter operation.