Removal and Installation
Removal
1. Remove air cleaner assembly. Disconnect the throttle cable from the throttle lever. Disconnect the distributor vacuum line, EGR vacuum line, venturi vacuum line, and fuel line from the carburetor.
2. Disconnect TSP electrical connection at the connector. Disconnect the choke PTC heater at the connector. Disconnect the canister bowl vent electrical connector. Disconnect the canister vent hose.
3. Remove the two carburetor attaching nuts and remove the carburetor from the intake manifold. Remove the carburetor mounting gasket, spacer (if equipped) and lower gasket from the intake manifold.
Installation
1. Clean the gasket mounting surfaces of the spacer (if equipped), the intake manifold and the carburetor. Place the spacer between two new gaskets on the intake manifold. Position the carburetor on the spacer and gasket and install the attaching nuts. To prevent leakage, distortion or damage to the carburetor body flange, snug the nuts and then alternately tighten each nut to 12-15 lb-ft.
2. Connect the fuel line, throttle cable, distributor vacuum line, EGR vacuum line and the venturi vacuum line. Connect the canister vent hose. Connect the TSP electrical connection and the choke heater wire. Connect the canister bowl vent electrical connector.
3. Install the air cleaner assembly. Adjust the curb idle speed and fast idle speed as necessary.