Ignition Timing: Testing and Inspection
Vehicle Preparation^ Key OFF
^ Electrical loads OFF (A/C, Heater, etc.)
^ Engine at normal operating temperature
^ Shift lever in PARK (A/T) or NEUTRAL (M/T)
^ Timing light connected
Procedure
1. Start engine using ignition switch (Do NOT use a remote starter)
2. Disconnect SPOUT connector
3. Check base timing: It should be within ±2° of the specification found on the VECI underhood decal
4. Reconnect SPOUT connector
^ Check for computed timing advance at 1500 RPM
NOTE: If timing is not within specifications, refer to Powertrain Management for Diagnostic Routines.