Information Bus
Description and Operation
Testing and Inspection
- Initial Inspection and Diagnostic Overview
- Symptom Related Diagnostic Procedures
- Pinpoint Tests
- Test A: Data Link Diagnostic Test
- Test B: PCM Does Not Respond to the Scan Tool
- Test C: ABS Control Module Does Not Respond to the NGS Tester
- Test D: RCM Does Not Respond to the Scan Tool
- Test E: IC Module Dose Not Respond to the Scan Tool Tester
- Test F: CSM Does Not Respond to the Scan Tool
- Test G: No Module/Network Communication - CKT 70
- Test H: Scan Tool Does Not Power Up
Locations
Diagrams
Tools and Equipment