Pinout Values and Diagnostic Parameters
CHECK AT ECU TERMINALS
TERMINAL VOLTAGE CHECK
Required Special Tool:
MB991997: ASC Check Harness
Connect the special tool ASC check harness (MB991997) to measure the voltage between each check connector terminal and the ground terminal (No.16 or 47).
CONTINUITY CHECK AT WIRING HARNESS-SIDE CONNECTOR
Required Special Tool:
MB991997: ASC Check Harness
1. When performing the continuity check, turn the ignition switch to LOCK (OFF) position, connect the special tool ASC check harness (MB991997) as shown in the figure, and disconnect the ASC-ECU connector.
2. Check for continuity between terminals shown in the chart below.
3. Terminal layout is shown in the figure.