Removal and Replacement
REMOVAL AND INSTALLATION
CAUTION:
- The parts indicated by * are the bolts with friction coefficient stabilizer. In removal, ensure there is no damage, clean dust and soiling from the bearing and thread surfaces, and tighten them to the specified torque.
INSTALLATION SERVICE POINTS
]]A[[ DIFFERENTIAL CARRIER ASSEMBLY INSTALLATION
1. Check that the length of the electronic control coupling stud bolt (A) is within the standard value range.
Standard value: 22.3 - 25.1 mm (0.88 - 0.99 inch)
2. If the length exceeds the standard value, replace the stud bolt.
Specified torque: 15± 3Nm (11± 2 ft-lb)
NOTE:
When replacing the stud bolts, always clean the stud bolt threaded holes.