Operation CHARM
: Car repair manuals for everyone.
Home
>>
Nissan-Datsun Truck
>>
1994
>>
Pathfinder 4WD V6-2960cc 3.0L SOHC MFI (VG30E)
>>
Repair and Diagnosis
>>
Powertrain Management
>>
Computers and Control Systems
>>
Sensors and Switches - Computers and Control Systems
>>
Throttle Full Close Switch
>>
Testing and Inspection
Throttle Full Close Switch: Testing and Inspection
1.
Disconnect
throttle position switch
harness connector.
2.
Check continuity between terminals [a] and [b].
3.
If No Good, replace
throttle position switch
.