Intake Manifold
Intake Manifold Removal Sequence:
Fuel Tube Assembly, Exhaust Manifold, ECT Sensor, Thermal Transmitter, PCV Valve, Throttle Chamber:
Intake Manifold Installation Sequence:
INTAKE MANIFOLD
1. Tighten all bolts and nuts to 4 Nm (0.4 kg-m, 2.9 ft. lbs.).
2. Tighten all bolts and nuts to 9 Nm (0.9 kg-m, 6.5 ft. lbs.).
3. Tighten all bolts and nuts to 8 to 10 Nm (0.8 to 1.0 kg-m, 5.8 to 7 ft. lbs.).