Active Test
ACTIVE TESTCAUTION:
^ Do not perform active test while driving.
^ Make sure to completely bleed air from the brake system.
^ The ABS and brake (EBD) warning lamps turn on during the active test.
Operation Procedure
1. Connect the CONSULT-II and CONSULT-II CONVERTER to the data link connector and start the engine.
CAUTION: If CONSULT-II is used with no connection of CONSULT-II CONVERTER, malfunctions might be detected in self-diagnosis depending on control unit which carries out CAN communication.
2. Touch "START (NISSAN BASED VHCL)" on the display screen.
3. Touch "ABS". If "ABS" is not indicated, go to GI-40, "CONSULT-II Data Link Connector (DLC) Circuit". With Manufacturer's Scan Tool
4. Touch "ACTIVE TEST".
5. The test item selection screen is displayed.
6. Touch necessary test item.
7. With the "MAIN SIGNALS" display selected, touch "START".
8. The Active Test screen will be displayed, so conduct the following test.
Solenoid Valve Operation Chart
Solenoid Valve Operation Chart:
NOTE:
^ If active test is performed with brake pedal depressed, pedal stroke may change. This is normal.
^ "TEST IS STOPPED" is displayed approximately 10 seconds after operation starts.
^ After "TEST IS STOPPED" is displayed, to perform test again, repeat Step 6.
ABS Motor
Touch "ON" and "OFF" on the screen. Check that ABS motor relay operates as shown in table.
NOTE:
^ If active test is performed with brake pedal depressed, pedal stroke may change. This is normal.
^ "TEST IS STOPPED" is displayed approximately 10 seconds after operation starts.
Booster Drive
CAUTION:
Perform active test subject to the conditions below.
^ Do not operate brake pedal during active test.
^ Make sure the engine revolution is over 500 rpm.
^ Make sure the vehicle is not moving.
Touch "UP" and "DOWN" on the screen. Check that booster drive operates as shown in table.
NOTE: "TEST IS STOPPED" is displayed approximately 10 seconds after operation starts.