Operation CHARM: Car repair manuals for everyone.

Control Module: Service and Repair

CONTROL VALVE WITH TCM

Control Valve with TCM and A/T Fluid Temperature Sensor 2

TM-217 COMPONENTS:





CONTROL VALVE WITH TCM REMOVAL AND INSTALLATION

Removal
1. Disconnect negative battery terminal.
2. Drain A/T fluid.
3. Disconnect A/T assembly harness connector.





4. Remove snap ring from A/T assembly harness connector.





5. Push A/T assembly harness connector.

CAUTION: Do not damage connector.

6. Remove oil pan and oil pan gasket.





7. Disconnect A/T fluid temperature sensor 2 connector (A).

CAUTION: Do not damage connector.

8. Straighten the four terminal clips to free the terminal cord assembly for A/T fluid temperature sensor 2 harness.
^ --->: Terminal clip
9. Straighten terminal clip to free the revolution sensor harness.





10. Disconnect revolution sensor connector.

CAUTION: Do not damage connector.








11. Remove bolts (A), (B) and (C) from control valve with TCM.
^ --->: Front





12. Remove control valve with TCM from transmission case.

CAUTION: When removing, be careful with the manual valve notch and manual plate height. Remove it vertically.





13. Remove A/T fluid temperature sensor 2 with bracket from control valve with TCM.





14. Remove bracket from A/T fluid temperature sensor 2.





15. Remove O-ring from A/T assembly harness connector.





16. Disconnect TCM connectors.

CAUTION: Do not damage connectors.





17. Remove A/T assembly harness connector from control valve with TCM using suitable tool.





18. Disconnect TCM connector and park/neutral position switch connector

CAUTION: Do not damage connectors.

Installation

CAUTION: After completing installation, check A/T fluid leakage and fluid level.





1. Connect TCM connector and park/neutral position switch connector.





2. Install A/T assembly harness connector to control valve with TCM.





3. Connect TCM connector.





4. Install new O-ring in A/T assembly harness connector.

CAUTION:
^ Do not reuse O-ring.
^ Apply ATF to O-ring.






5. Install A/T fluid temperature sensor 2 to bracket.





6. Install A/T fluid temperature sensor 2 (with bracket) to control valve with TCM. Tighten A/T fluid temperature sensor 2 bolt to the specified torque. Refer to "COMPONENTS".

CAUTION: Adjust bolt hole of bracket to bolt hole of control valve with TCM.





7. Install control valve with TCM in transmission case.

CAUTION:
^ Make sure that turbine revolution sensor is securely installed into turbine revolution sensor hole.
^ Hang down revolution sensor harness toward outside so as not to disturb installation of control valve with TCM.
^ Adjust A/T assembly harness connector of control valve with TCM to terminal hole of transmission case.





^ Assemble it so that manual valve cutout is engaged with manual plate projection.









8. Install bolts (A), (B) and (C) in control valve with TCM.
^ --->: Front





9. Tighten bolt (1), (2) and (3) temporarily to prevent dislocation. After that tighten them in order (1 ---> 2 ---> 3). Then tighten other bolts.
^ --->: Front
10. Tighten control valve with TCM bolts to the specified torque.
Refer to "COMPONENTS".





11. Connect A/T fluid temperature sensor 2 connector (A).
12. Securely fasten terminal cord assembly and A/T fluid temperature sensor 2 harness with terminal clips
^ --->: Terminal clip





13. Connect revolution sensor connector.





14. Securely fasten revolution sensor harness with terminal clip.
15. Install oil pan to transmission case.





16. Pull up A/T assembly harness connector.

CAUTION: Do not damage connector.





17. Install snap ring to A/T assembly harness connector.
18. Connect A/T assembly harness connector.
19. Connect the negative battery terminal.
20. Refill the A/T with fluid and check the fluid level and for fluid leakage.

REMOVAL AND INSTALLATION OF A/T FLUID TEMPERATURE SENSOR 2

Removal
1. Disconnect negative battery terminal.
2. Remove oil pan and oil pan gasket.





3. Disconnect A/T fluid temperature sensor 2 connector (A).

CAUTION: Do not damage connector.

4. Straighten terminal clip ---> to free A/T fluid temperature sensor 2 harness.





5. Remove A/T fluid temperature sensor 2 with bracket from control valve with TCM.





6. Remove bracket from A/T fluid temperature sensor 2.

Installation

CAUTION: After completing installation, check A/T fluid leakage and fluid level.





1. Install A/T fluid temperature sensor 2 to bracket.





2. Install A/T fluid temperature sensor 2 (with bracket) in control valve with TCM. Tighten A/T fluid temperature sensor 2 bolt to the specified torque. Refer to "COMPONENTS".

CAUTION: Adjust bolt hole of bracket to bolt hole of control valve with TCM.





3. Connect A/T fluid temperature sensor 2 connector (A).
4. Securely fasten A/T fluid temperature sensor 2 harness with terminal clip --->.
5. Install oil pan to transmission case.
6. Connect the negative battery terminal.
7. Refill the A/T with fluid and check the fluid level and for fluid leakage.