Operation CHARM
: Car repair manuals for everyone.
Home
>>
Nissan-Datsun Truck
>>
2010
>>
Murano AWD V6-3.5L (VQ35DE)
>>
Repair and Diagnosis
>>
Instrument Panel, Gauges and Warning Indicators
>>
Service and Repair
>>
Meter Control Switch
>>
Removal And Installation
Removal And Installation
METER CONTROL SWITCH
Removal and Installation
REMOVAL
1.
Remove cluster lid A.
Exploded View
.
2.
Remove meter control switch connectors and remove meter control switches.
INSTALLATION
Install in the reverse order of removal.