Operation CHARM: Car repair manuals for everyone.

Diagnosis Procedure





ELECTRICAL LOAD SIGNAL


Description

The electrical load signal (Headlamp switch signal, etc.) is transferred through the CAN communication line from BCM to ECM via IPDM E/R.




ELECTRICAL LOAD SIGNAL


Diagnosis Procedure

1.CHECK LOAD SIGNAL CIRCUIT OVERALL FUNCTION-I
1. Turn ignition switch ON.
2. Connect CONSULT-III and select "DATA MONITOR" mode.
3. Select "LOAD SIGNAL" and check indication under the following conditions.





OK or NG
OK - GO TO 2.
NG - GO TO 4.
2.CHECK LOAD SIGNAL CIRCUIT OVERALL FUNCTION-II
Check "LOAD SIGNAL" indication under the following conditions.





OK or NG
OK - GO TO 3.
NG - GO TO 5.
3.CHECK HEATER FAN SIGNAL CIRCUIT OVERALL FUNCTION
Select "HEATER FAN SW" and check indication under the following conditions.





OK or NG
OK - INSPECTION END
NG - GO TO 6.
4.CHECK REAR WINDOW DEFOGGER SYSTEM
Initial Inspection and Diagnostic Overview.
- INSPECTION END
5.CHECK HEADLAMP SYSTEM
Exterior Lighting.
- INSPECTION END
6.CHECK HEATER FAN CONTROL SYSTEM
Manual A/C (Type 1 - Two Control Dial System) (TYPE 1) or Manual A/C (Type 2 - Three Control Dial System) (TYPE 2).
- INSPECTION END