Electrical Load Signal
ELECTRICAL LOAD SIGNAL
Description
The electrical load signal (Headlamp switch signal, etc.) is transferred through the CAN communication line from BCM to ECM via IPDM E/R.
Diagnosis Procedure
1.CHECK LOAD SIGNAL CIRCUIT OVERALL FUNCTION-I
1. Turn ignition switch ON.
2. Connect CONSULT-III and select "DATA MONITOR" mode.
3. Select "LOAD SIGNAL" and check indication under the following conditions.
OK or NG
OK - GO TO 2.
NG - GO TO 4.
2.CHECK LOAD SIGNAL CIRCUIT OVERALL FUNCTION-II
Check "LOAD SIGNAL" indication under the following conditions.
OK or NG
OK - GO TO 3.
NG - GO TO 5.
3.CHECK HEATER FAN SIGNAL CIRCUIT OVERALL FUNCTION
Select "HEATER FAN SW" and check indication under the following conditions.
OK or NG
OK - INSPECTION END
NG - GO TO 6.
4.CHECK REAR WINDOW DEFOGGER SYSTEM
Filament Check.
- INSPECTION END
5.CHECK HEADLAMP SYSTEM
Removal and Replacement.
- INSPECTION END
6.CHECK HEATER FAN CONTROL SYSTEM
CONSULT-III Function (with automatic air conditioner) or CONSULT-III Function Manual A/C (Type 1), "CONSULT-III
Function (HVAC)" (with manual air conditioner).
- INSPECTION END