Pre-Program Signal Check
1. Remove power meter.2. Remove nuts securing instrument switches.
3. Remove instrument switches.
Instrument Switch And Cluster Lid:
4. Remove cluster lid A.
5. Remove combination meter.
6. Disconnect connectors from instrument harness.
Diagnostic Sub Harness:
Sub Harness Connection:
7. Connect diagnostic sub harness to meter.
8. Turn ignition switch ON.
Satisfactory Self Check Display:
9. If the display is as shown above, results are satisfactory.