Operation CHARM: Car repair manuals for everyone.

Engine Assembly

Fig. 81 Main Bearing Identification:




Fig. 82 Main Bearing Bolt Tightening Sequence. 1989 Maxima:




Fig. 83 Main Bearing Bolt Tightening Sequence. 1990-93 300ZX:




Fig. 84 Main Bearing Bolt Tightening Sequence. Except 1989 Maxima & 1990-93 300ZX:





1. Install main bearings, Fig. 81, crankshaft and bearing cap. Tighten attaching bolts to specifications in sequence, Figs. 82, 83 and 84 in 2 or 3 steps.

Fig. 85 Piston Ring Positioning:





2. Install piston assemblies with rings properly positioned, Fig. 85.
3. Reverse remainder of engine disassembly procedure to complete assembly, noting the following:

Fig. 86 Cylinder Head Bolt Tightening Sequence. Except 1990-92 300ZX & 1992-93 Maxima w/VE30DE Engine:




Fig. 87 Cylinder Head Bolt Tightening Sequence. 1990-93 300ZX:





a. On models except 1992 Maxima with VE30DE engine, tighten cylinder head attaching bolts to specifications using sequence shown in Figs. 86 and 87.

Fig. 88 Intake Manifold Bolt Tightening Sequence. 1990-93 300ZX:




Fig. 89 Intake Manifold Bolt Tightening Sequence. 1989 300ZX & Maxima w/VG30E Engine:




Fig. 90 Intake Manifold Bolt Tightening Sequence. 1990-93 Pathfinder & Pickup:





b. Tighten intake manifold attaching bolts in sequence, Figs. 88, 89 and 90 to specifications in 2 or 3 steps.
c. On 1992 Maxima with VE30DE engine, refer to TIMING BELT for cylinder head and intake manifold installation.