Operations 1, 2, 3, and 4 - Apply Undercoating and Wax
1. Spray 3M Rubberized Undercoating P/N 051135-08883 liberally onto the wheel house seam. The undercoating should extend approximately 4" to each side of the seam. The undercoating must dry at least 60 minutes before applying the Tectyl(R) 517 bitumen wax.