Initial Inspection and Diagnostic Overview
INSPECTION OF A/T CONTROL UNIT- Measure voltage between each terminal and terminal (15) or (48) by following "A/T CONTROL UNIT INSPECTION TABLE".
- Pin connector terminal layout.
A/T Control Unit Inspection Table Part 1:
A/T Control Unit Inspection Table Part 2:
A/T Control Unit Inspection Table Part 3:
A/T Control Unit Inspection Table Part 4:
A/T CONTROL UNIT INSPECTION TABLE
INHIBITOR SWITCH
1. Disconnect control cable from manual shaft.
2. Check continuity between terminals (1) and (2) and between terminals (3) and (4) , (5), (6), (7), (8), (9) while moving selector lever through each range.
3. If N.G., adjust inhibitor switch.
4. Check terminal continuity again.
5. If N.G., replace inhibitor switch.
FLUID TEMPERATURE SENSOR
- For removal and installation, refer to "ON-VEHICLE SERVICE". On Vehicle Service
- Check resistance between two terminals while changing temperature as shown.
REVOLUTION SENSOR
- For removal and installation, refer to "ON-VEHICLE SERVICE". On Vehicle Service
- Check resistance between terminals (1), (2) and (3)
TIMING SOLENOID
- For removal and installation, refer to "ON-VEHICLE SERVICE". On Vehicle Service
- Check resistance between two terminals.
Resistance:
Timing solenoid 20 - 40 ohm
4-UNIT SOLENOID ASSEMBLY
(Shift solenoid A, B, lock-up solenoid and line pressure solenoid)
- For removal and installation, refer to "ON-VEHICLE SERVICE". On Vehicle Service
- Check resistance between terminals of each solenoid.
DROPPING RESISTOR
- Check resistance between two terminals.
Resistance: 11.2 - 12.8 ohm
OVERDRIVE SWITCH
- Check continuity between tow terminals.