Operation CHARM: Car repair manuals for everyone.

Part 2

Output Shaft Preload Adjusting Shim - VG30 Engine Models (RE4F02A):




Idler Gear Preload Adjusting Shim - VG30 Engine Models (RE4F02A):





REDUCTION GEAR - VE30 engine models (RE4F04V)
Turning torque of reduction gear 0.049 - 0.162 N.m (0.5 - 1.65 kg.cm, 0.4 - 1 4 in.lb)

Reduction Gear Bearing Adjusting Shims Part 1:





Reduction Gear Bearing Adjusting Shims Part 2:





CLUTCH PACK END PLAY - VG30 engine models (RE4F02A)
0.4 - 0.8 mm (0.016 - 0.031 in)

Thrust Washers For Adjusting Clutch Back End Play:





REVERSE CLUTCH END PLAY - VE30 engine models (RE4F04V)
Reverse clutch end play 0.55 - 0.90 mm (0.0217 - 0.0354 in.)

Thrust Washers For Adjusting Reverse Clutch Drum End Play:




Park Pawl - VG30 Engine Models (RE4F02A) Clearence "L":




ACCumulator - VE30 Engine Models (RE4F04V) O-ring:




Return Spring:




Band Servo - VE30 Engine Models (RE4F04V) Return Spring:




Removal And Installation:




Output Shaft Seal Ring Clearence:




Output Shaft Adjusting Shims:




Bearing Retainer Seal Ring Clearence:





TOTAL END PLAY
Total end play: 0.25 - 0.55 mm (0.0098 - 0.0217 in.)

Bearing Race For Adjusting Total And Play - VG30 Engine Models:




Bearing Race For Adjusting Total And Play - VE30 Engine Models: