Without CONSULT
OVERALL FUNCTION CHECK
This procedure can be used for checking the overall function of the EGR and canister control solenoid valve circuit. During this check, a DTC might not be confirmed.
1. Start engine and warm it up sufficiently.
2. Turn ignition switch "OFF" and wait for at least 3 seconds.
3. Start engine again.
4. Check the voltage between ECM terminal 103 and ground at idle speed.
Voltage: 0.04-0.08V
5. Check that the voltage changes to battery voltage and returns to 0.04-0.08 volts when the engine speed increases to about 2,500 rpm.