Operation CHARM: Car repair manuals for everyone.

Start Signal

CONSULT-II Reference Value In Data Monitor Mode:






EC-S/SIG-01:




EC-S/SIG-01 - Connector View:




WIRING DIAGRAM

ECM Terminals And Reference Value:




ECM TERMINALS AND REFERENCE VALUE MEASURED BETWEEN EACH TERMINAL AND GROUND.

CAUTION: DO NOT USE ECM GROUND TERMINALS WHEN MEASURING INPUT/OUTPUT VOLTAGE. DOING SO MAY RESULT IN DAMAGE TO THE ECM'S TRANSISTOR. USE A GROUND OTHER THAN ECM TERMINALS, SUCH AS THE GROUND.

Steps 1 - 3:




Steps 4 - 5:




DIAGNOSTIC PROCEDURE