Instrument Cluster / Carrier: Description and Operation
System DescriptionPower is supplied at all times:
- through 10 A fuse (No.38, located in the fuse and fusible link box)
- to lighting switch terminal 11.
The lighting switch must be in parking lamp (1ST) or headlamp "ON" (2ND) position for illumination. The illumination control switch controls the amount of current to the illumination system. As the amount of current increases, the illumination becomes brighter.
The following chart shows the power and ground connector terminals for the components included in the illumination system.
The ground for all of the components is controlled through terminals 2 and 3 of the illumination control switch to body grounds M28 and M54.