Power Supply
POWER SUPPLY AND GROUNDPower is supplied at all times:
- through 10A fuse [No. 12, located in the fuse block (J/B)]
- to security indicator lamp terminal 1 and
- to key switch terminal 2.
Power is supplied at all times:
- through 10A fuse (No.37, located in the fuse and fusible link box)
- to smart entrance control unit terminal 10.
With the ignition switch in the ON or START position, power is supplied:
- through 10A fuse [No. 10, located in the fuse block (J/B)]
- to smart entrance control unit terminal 33.
With the ignition switch in the ACC or ON position, power is supplied:
- through 10A fuse [No. 1, located in the fuse block (J/B)]
- to smart entrance control unit terminal 21.
Ground is supplied:
- to smart entrance control unit terminal 16
- through body grounds M28 and M54.