Solar Sensor: Testing and Inspection
COMPONENT INSPECTIONSunload Sensor
Measure voltage between front air control harness connector M49 terminal 10 and ground.
If NG, replace front air control.
- When checking sunload sensor, select a place where sun shines directly on it.