Terminal Cord Assembly
Terminal cord assemblyREMOVAL
1. Remove PNP switch. Refer to "Components".
2. Remove side cover. Refer to "REMOVAL".
3. Disconnect solenoid valve connectors.
4. Remove terminal cord assembly.
INSTALLATION
Installation is the reverse order of removal.