Operation CHARM
: Car repair manuals for everyone.
Home
>>
Nissan-Datsun
>>
2008
>>
Altima L4-2.5L (QR25DE) Hybrid
>>
Repair and Diagnosis
>>
Relays and Modules
>>
Relays and Modules - Brakes and Traction Control
>>
ABS Main Relay
>>
Testing and Inspection
>>
ABS Motor Relay No. 1 and No. 2
ABS Motor Relay No. 1 and No. 2
Inspection
INSPECT ABS MOTOR RELAY NO.1 AND NO.2
Measure the resistance according to the value(s) in the table below.
If the value is not as specified, replace the ABS motor relay No.1 or No.2.