Alternator: Service and Repair
Exploded View SC-24:
Removal and Installation
REMOVAL
1. Disconnect the battery cable from the negative terminal.
2. Remove drive belt.
3. Disconnect generator connector.
4. Remove "B" terminal nut.
5. Remove generator bolts.
6. Remove generator assembly from the vehicle.
GENERATOR PULLEY INSPECTION
- Check that the generator pulley does not rattle.
- Check that the generator pulley nut is properly tightened.
Generator pulley nut : 118 N.m (12.0 kg-m, 87 ft-lb)
INSTALLATION
Installation is in the reverse order of removal.
CAUTION: Be sure to tighten "B" terminal nut carefully.