Operation CHARM
: Car repair manuals for everyone.
Home
>>
Nissan-Datsun
>>
2011
>>
Versa L4-1.6L (HR16DE)
>>
Repair and Diagnosis
>>
Powertrain Management
>>
Ignition System
>>
Ignition Timing
>>
Testing and Inspection
Ignition Timing: Testing and Inspection
INSPECTION AND ADJUSTMENT
IGNITION TIMING
: Special Repair Requirement
1.CHECK
IGNITION TIMING
1.
Attach timing light to No. 1 ignition coil (1) wire as shown.
2.
Check
ignition timing
.
- INSPECTION END