Power Supply And Ground Circuit
POWER SUPPLY AND GROUND CIRCUIT
Diagnosis Procedure
Regarding Wiring Diagram information, refer to "Wiring Diagram" [1][2]Body Control Module.
1. CHECK FUSE AND FUSIBLE LINK
Check that the following fuse and fusible link are not blown.
Is the fuse or fusible link blown?
YES- Replace the blown fuse or fusible link after repairing the affected circuit.
NO- GO TO 2
2. CHECK POWER SUPPLY CIRCUIT
1.Disconnect BCM connector M21.
2.Check voltage between BCM connector M21 terminals 131, 139 and ground.
Is the inspection result normal?
YES- GO TO 3
NO- Repair or replace harness or connectors.
3. CHECK GROUND CIRCUIT
Check continuity between BCM connector M21 terminals 134, 143 and ground.
Is the inspection result normal?
YES- Inspection End.
NO- Repair or replace harness or connectors.