| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace |
Manual Trans | 26.0 | 12.0 | A | Includes: R&R Engine, Cylinder Head, Liners, Oil Pan And Plastigauge Bearings. |
Auto Trans | 26.5 | 12.5 | A | Includes: R&R Engine, Cylinder Head, Liners, Oil Pan And Plastigauge Bearings. |
Note |
With AC, Add | 0.8 | 0.5 | A | |
Add Following Operations If Performed With Piston & Ring Jobs |
Main Bearings, Renew | 2.0 | 0.0 | A | Add Any Of The Following Operation If Performed Along With Piston & Ring Jobs. |
Crankshaft, Renew | 3.0 | 2.5 | A | Add Any Of The Following Operation If Performed Along With Piston & Ring Jobs. |
Timing Chain, Renew | 1.5 | 0.0 | A | Add Any Of The Following Operation If Performed Along With Piston & Ring Jobs. |
Tune-Up | 0.5 | 0.0 | A | Add Any Of The Following Operation If Performed Along With Piston & Ring Jobs. |
Oil Pump, Renew | 0.4 | 0.0 | A | Add Any Of The Following Operation If Performed Along With Piston & Ring Jobs. |