Operation CHARM: Car repair manuals for everyone.

Crankshaft: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace13.30.0AIncludes: R&R Engine And Renew Main & Rod Bearings.
Note
To R&R Cylinder Head, Add
One Bank3.20.0A
Both Banks5.20.0A
With AC, Add0.80.0A
To Replace Piston Rings, Add
One CYL0.70.0A
All Cyls3.80.0A
To Replace Connecting Rods, Add
One CYL0.50.0A
All Cyls2.70.0A
To Replace Pistons, Add
One CYL0.90.0A
All Cyls6.00.0A
With C.C.C., Add0.50.0A
With Cruise Control, Add0.20.0A