Operation CHARM: Car repair manuals for everyone.

Piston Ring: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank10.80.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder And Plastigage Bearings.
Left Bank10.80.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder And Plastigage Bearings.
Both Banks14.10.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder And Plastigage Bearings.
All Cyls
Right Bank12.90.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder And Plastigage Bearings.
Left Bank12.90.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder And Plastigage Bearings.
Both Banks18.10.0AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder And Plastigage Bearings.
Note
With AC, Add
Right Bank0.40.0A
Left or Both Banks0.80.0A
To Grind Valves, Add3.80.0A
With C.C.C., Add0.50.0A
With Cruise Control, Add0.20.0A