Connecting Rod: Labor Times
Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
Replace | ||||
Add Following Operations If Performed With Piston & Ring Jobs | ||||
Crankshaft, Renew | 0.2 | 0.0 | A | |
Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
Tune-Up | 0.5 | 0.0 | A | |
Note | ||||
With AC, Add | 0.5 | 0.0 | A | |
With PS, Add | 0.8 | 0.0 | A | |
One CYL | 9.7 | 0.0 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
Each Additional | 0.7 | 0.0 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
All Cyls | 10.9 | 0.0 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |