Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Note
With AC, Add0.50.3AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
With PS, Add0.80.5AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew2.00.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew3.40.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Oil Pump, Renew1.30.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Oil Pump Screen, Clean0.20.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Rear Main Oil Seal, Renew1.50.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Timing Belt, Renew0.40.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
Tune-Up0.50.0AAdd The Following Operations If Performed Along With Piston & Ring Jobs.
One CYL9.76.9AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
All Cyls12.58.9AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Each Additional1.00.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.