Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank8.56.1AIncludes: R&R Cylinder Head & Oil Pan.
Left Bank7.45.3AIncludes: R&R Cylinder Head & Oil Pan.
Both Banks11.68.3AIncludes: R&R Cylinder Head & Oil Pan.
All Cylinders15.411.0AIncludes: R&R Cylinder Head & Oil Pan.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew
Each0.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft3.30.0ADoes Not Include: R&R Engine.
Oil Pump, Renew0.90.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Timing Chain & Gears, Renew1.00.0ADoes Not Include: R&R Engine.
Tune-Up0.60.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.