Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Note
With AC, Add0.40.2AIncludes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.00.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew3.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Oil Pump, Renew1.40.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Timing Belt, Renew0.70.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Tune-Up0.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
One CYL8.46.0AIncludes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings.
All Cyls11.28.0AIncludes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings.
Each Additional1.00.7AIncludes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings.